Unit 5 — Calibration and Verification
TM-GEAR-006 — Open Handout TM Chapters: Chapter 6, Chapter 7 ELOs: Calibrate the MOTORIZED COIL WINDER — ESP32 CONTROLLER; verify performance against acceptance criteria; complete calibration log Estimated time: 45 minutes (actual lab work required)
Step 1: Read the TM
Open TM-GEAR-006. Read Chapter 6 — Calibration and Chapter 7 — Verification and Acceptance completely.
Then come back here.
Chapter 6 — Calibration Content
- Spindle step calibration: command 10 revolutions; count actual revolutions with a mark on the former. Adjust steps_per_rev in firmware if actual turns differ from commanded.
- Traverse calibration: command 10 mm of traverse travel. Measure with a micrometer. Adjust mm_per_step in firmware.
- Wire gauge calibration: measure actual wire OD with a micrometer for each gauge in use. Update the wire_od_mm lookup table in firmware.
Chapter 7 — Verification Content
- Wind a test coil: 10 turns, 28 AWG, close-wound, 20 mm former. Expected coil length: 10 × 0.321 mm (28 AWG OD) = 3.21 mm. Measure: must be within 0.5 mm of expected.
- Measure inductance with LCR meter. Compare to Wheeler's formula. Agreement within 10% confirms turn count and pitch are correct.
- Step alignment: at end of winding, traverse return to home position must be within 1 step of the home limit switch.
- Log: date, test coil gauge and turns, measured length, measured inductance, step calibration values, operator.
Calibration vs. Verification — Distinction
Calibration (Chapter 6): active adjustments to bring the component within specification. You are permitted to adjust, tweak, and repeat until the criterion is met.
Verification (Chapter 7): independent confirmation that the calibration succeeded. No adjustments are permitted during verification. If a verification check fails, you return to Chapter 6, not to Chapter 7.
Acceptance Criterion
Locate the acceptance criterion in Chapter 6 or Chapter 7.
Write the exact criterion from the TM here before you start the lab:
Lab Checklist
Work through each item in sequence. Do not skip steps.
- [ ] All required equipment gathered and ready
- [ ] Equipment warmed up per TM requirements
- [ ] All Chapter 4 setup steps verified complete
- [ ] Chapter 6 calibration performed (all steps)
- [ ] Calibration criterion met (recorded below)
- [ ] Chapter 7 verification performed (all steps, no adjustments)
- [ ] All verification criteria passed
- [ ] Calibration log entry completed
Calibration Log Entry
- [ ] Date
- [ ] Equipment used
- [ ] Measurements taken
- [ ] Results vs. criteria
- [ ] Operator name
Record your results:
| Item | Measured Value | Acceptance Criterion | Pass/Fail |
|---|---|---|---|
| (from Ch 7) | |||
| (from Ch 7) | |||
| (from Ch 7) |
Self-Check Questions
SC5-1. What is the acceptance criterion for this calibration (from Chapter 7)?
SC5-2. During verification, one reading fails. What is the correct action per the TM?
SC5-3. List the items required in a calibration log entry per Chapter 7.
SC5-4. What is the difference between calibration and verification in this context?
SC5-5. If the component passes all Chapter 7 checks, what does that tell you about its current state?
Answer Key
SC5-1. See Chapter 7. The criterion is stated as a specific value with units.
SC5-2. Stop verification. Return to Chapter 6 and re-calibrate. Diagnose the cause before re-adjusting.
SC5-3. See Chapter 7, last numbered step. The log items are listed there.
SC5-4. Calibration allows adjustments; verification does not. Verification is independent confirmation.
SC5-5. It tells you the component is performing within its specified parameters at this time. It does not tell you how long it will remain in calibration — periodic re-verification is required.
Checkpoint
You are ready for the final assessment when you can: - [ ] State the acceptance criterion from memory - [ ] State the difference between calibration and verification - [ ] State the required log items from memory
→ Proceed to Final Assessment