Unit 5 — Calibration and Verification
TM-TOOL-010 — Open Handout TM Chapters: Chapter 6, Chapter 7 ELOs: Calibrate the SWR METER — CONSTRUCTION AND USE; verify performance against acceptance criteria; complete calibration log Estimated time: 45 minutes (actual lab work required)
Step 1: Read the TM
Open TM-TOOL-010. Read Chapter 6 — Calibration and Chapter 7 — Verification and Acceptance completely.
Then come back here.
Chapter 6 — Calibration Content
- Connect a calibrated 50Ω dummy load to OUT. Apply known RF power (e.g., 10W at 14.175 MHz from a calibrated transmitter).
- Adjust FWD calibration trimmer until FWD meter reads exactly full scale for the selected range (e.g., at the 10W mark on the 10W range).
- Verify REF meter reads zero (or minimum). Adjust REF null trimmer if deflection >2% of FSD.
- Apply a known 100Ω load (SWR 2.0:1). Verify SWR reads 2.0 ± 0.2.
- Repeat calibration procedure for VHF section at 145 MHz.
Chapter 7 — Verification Content
- SWR accuracy: measured SWR must be within ±0.1 SWR units for SWR <3:1; within ±10% for SWR 3:1–10:1.
- Power accuracy: forward power reading within ±5% of actual power (verified with calibrated power reference).
- Directivity check: with 50Ω load on OUT, REF deflection must be <2% of FWD deflection at full power (indicates ≥34 dB directivity).
- Insertion loss: <0.1 dB at 1.8–30 MHz; <0.2 dB at 50–150 MHz; <0.5 dB at 150–450 MHz.
- Log: date, calibration load used, forward calibration power, SWR accuracy check results, insertion loss, operator.
Calibration vs. Verification — Distinction
Calibration (Chapter 6): active adjustments to bring the tool within specification. You are permitted to adjust, tweak, and repeat until the criterion is met.
Verification (Chapter 7): independent confirmation that the calibration succeeded. No adjustments are permitted during verification. If a verification check fails, you return to Chapter 6, not to Chapter 7.
Acceptance Criterion
A criterion found in Chapter 6: 2%. Confirm the exact criterion in the TM.
Write the exact criterion from the TM here before you start the lab:
Lab Checklist
Work through each item in sequence. Do not skip steps.
- [ ] All required equipment gathered and ready
- [ ] Equipment warmed up per TM requirements
- [ ] All Chapter 4 setup steps verified complete
- [ ] Chapter 6 calibration performed (all steps)
- [ ] Calibration criterion met (recorded below)
- [ ] Chapter 7 verification performed (all steps, no adjustments)
- [ ] All verification criteria passed
- [ ] Calibration log entry completed
Calibration Log Entry
- [ ] Date
- [ ] Equipment used
- [ ] Measurements taken
- [ ] Results vs. criteria
- [ ] Operator name
Record your results:
| Item | Measured Value | Acceptance Criterion | Pass/Fail |
|---|---|---|---|
| (from Ch 7) | |||
| (from Ch 7) | |||
| (from Ch 7) |
Self-Check Questions
SC5-1. What is the acceptance criterion for this calibration (from Chapter 7)?
SC5-2. During verification, one reading fails. What is the correct action per the TM?
SC5-3. List the items required in a calibration log entry per Chapter 7.
SC5-4. What is the difference between calibration and verification in this context?
SC5-5. If the tool passes all Chapter 7 checks, what does that tell you about its current state?
Answer Key
SC5-1. See Chapter 7. The criterion is stated as a specific value with units.
SC5-2. Stop verification. Return to Chapter 6 and re-calibrate. Diagnose the cause before re-adjusting.
SC5-3. See Chapter 7, last numbered step. The log items are listed there.
SC5-4. Calibration allows adjustments; verification does not. Verification is independent confirmation.
SC5-5. It tells you the tool is performing within its specified accuracy at this time. It does not tell you how long it will remain in calibration — periodic re-calibration is required.
Checkpoint
You are ready for the final assessment when you can: - [ ] State the acceptance criterion from memory - [ ] State the difference between calibration and verification - [ ] State the required log items from memory
→ Proceed to Final Assessment